Brown Dental Clinic


Brown Dental Clinic

Fort Rucker, AL

Customer: U.S. Army

Service: Engineering


  • Type of Facility: Dental Clinic
  • Square Footage: 13,187 SF
  • Project Delivery Method: Site Investigation and Report, Value added Engineering Study, and Type 3 Work Plan
  • Period of Performance: September 2010 through July 2012
  • Project Description: Our team renovated the Brown Dental Clinic (BDC) bringing it up to current standards and to support (22) dental treatment chairs. The 13,187 SF Design–Build project involved design and construction management and an additional 10,000 SF of transition space to ensure daily operations of the dental clinic were not effected during the renovations. Multiple phases were required: Phase 1: Design and Construction of Transition Facility; Phase 2: Design of BDC; and Phase 3: Renovate BDC.

Achievement: LEED Silver Certification